5.1.1.1 Cleaning and drying. - Unless otherwise specified,
Clock Starter Mechanisms shall be cleaned in accordance with
Method C-1 of Military Specification MIL-P-116 and dried in
accordance with one or more of the procedures given in Military
Specification MIL-P-116, provided the selected procedure IS
not injurious to the item.
Preservative application. - (Not applicable ).
5.1.1.2
5.1.1.3 Unit packing. - Each Clock Starter Mechanism
shall be individually packaged in accordance with Bureau of
Ordnance LD 295891.
5.1.2 Level B. - (Not applicable).
.
5.1.3 Level C. - (Not applicable
.a
5.2 Packing
5.2.1 Level A.
5.2.1.1 Exterior containers. - Four (4) Clock Starter
Mechanisms shall be packed in accordance with Bureau of Ordnance
.
LD 295892.
5.2.2 Level B. - (Not applicable).
5.2.3 Level C. - (Not applicable ).
5.3 Markinq.
5.3.1 Normal markings. - In addition to any special mark-
ing required by the contract or order, all markings shall be
in accordance with Military Standard MIL-STD-129.
5.3.1.1 For detailed marking requirements, see Bureau of
Ordnance Drawing Number 1476194
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business